Practical Field Information about Telecommunication Technologies

Case Study on Countermeasures to Protect Telecommunication Buildings from Lightning Strikes

Technical Assistance and Support Center, NTT EAST

Abstract

This article presents the fundamental principles for protecting power and communication equipment installed in telecommunication buildings from lightning surges and an example of equipment failure caused by lightning, along with the corresponding countermeasures.

Keywords: lightning surge, potential equalization, bypass, isolation

PDF PDF

1. Introduction

The frequency of lightning strikes in Japan has been increasing due to the effects of climate change; the summer of 2025 experienced the second-highest number of lightning strikes recorded in the past eight years. When a lightning strike occurs, it generates extremely high voltages and currents, known as lightning surges, in power and communication lines. If such a surge current flows along these lines into a telecommunication building and reaches communication or power equipment, it can cause temporary operational stoppages, damage or burn out internal components, and even lead to equipment failure. Failures of communication equipment within such buildings will directly lead to service outages (such as the loss of Internet and telephone connectivity), affecting a large number of users. It is therefore crucial to implement comprehensive protection measures against lightning surges throughout the entire building.

In this article, the fundamental principles for protecting power and communication equipment installed in telecommunication buildings from lightning surges are outlined, and an example of equipment failure caused by lightning, along with the corresponding countermeasures, is presented.

2. Lightning protection measures

To prevent lightning from damaging communication equipment and power equipment installed in a telecommunication building, it is essential to ensure that lightning-surge voltages and currents caused by a lightning strike do not reach the equipment. To provide such protection, surge arresters are installed on the power and communication lines entering the building. Measures are also in place to establish potential equalization, i.e., preventing the creation of potential differences between locations on the same floor or between pieces of communication equipment or power equipment that would arise when a lightning surge occurs. Where necessary, to divert lightning surges away from the equipment, bypass measures are also introduced. On top of those measures, for wiring that spans multiple floors, isolation measures are implemented. The fundamental concepts of potential equalization, bypass, and isolation, as well as how these measures are applied within telecommunication buildings, are explained in the following sections.

2.1 Potential equalization

The concept of lightning protection through potential equalization is shown in Fig. 1. When multiple grounding lines (such as ones for surge arresters and communication equipment) are present, lightning surges can create a potential difference between the lines. This potential difference poses a risk of a lightning-surge current entering the communication equipment and causing it to malfunction. To prevent this situation, the grounding points are interconnected to equalize the potential, thus eliminating the potential difference, and prevent the surge current from entering the equipment. This process is known as potential equalization.


Fig. 1. Concept of lightning protection via potential equalization.

Two examples of measures for achieving potential equalization in telecommunication buildings are described as follows. As the first example, the integration of grounding systems is shown in Fig. 2. In this example, the measure was properly implemented on the first and second floors but insufficiently implemented on the third floor. In telecommunication buildings, potential equalization (including that for safety grounding) is achieved by consolidating grounding electrodes at a single location (Interface A on the first floor). To ensure potential equalization at the floor level, grounding is consolidated at a single location on each floor (Interface B on the first and second floors). This grounding configuration prevents the occurrence of potential differences across the entire building and within individual floors. On the third floor, although the grounding is consolidated at Interface B, the measure is considered insufficient because a separate, independent grounding connection remains at the main distribution frame (MDF).


Fig. 2. Measure for potential equalization by integrating grounding systems in a telecommunication building and example of inadequate potential equalization.

As the second example, the potential equalization of communication equipment within a telecommunication building is shown in Fig. 3. Potential equalization is achieved by connecting both power lines and grounding lines from communication equipment (1) and (2) to a direct current (DC) distribution unit that supplies power. However, if a grounding line is connected to a location other than the DC distribution unit (as is the case with communication equipment (3)), a potential difference arises and allows lightning surges to enter the equipment.


Fig. 3. Measure for potential equalization of communication equipment in a telecommunication building and example of inadequate potential equalization.

2.2 Bypass

The concept of lightning protection using a bypass is shown in Fig. 4. A bypass is a means of establishing an alternative path that prevents a lightning surge from propagating to communication equipment or other devices.


Fig. 4. Conceptual diagram of lightning protection using a bypass.

A surge arrester incorporating a variable resistor (referred to as a varistor) is installed as a bypass measure. The resistance of varistors decreases when they are subjected to high voltage. Consequently, when a high voltage, such as a lightning surge, is applied, the resistance of the varistor decreases. Therefore, the lightning surge flows into the surge arrester rather than the communication equipment. This bypass thus prevents the lightning surge from entering the communication equipment.

An example of a bypass in a telecommunication building is shown in Fig. 5. By establishing a diversion path via a surge arrester for lightning surges entering through communication lines, it is possible to protect communication equipment and other devices.


Fig. 5. Example of bypass measure for a telecommunication building.

2.3 Isolation

The concept of lightning protection via electrical isolation is shown in Fig. 6. As a protective measure, isolation blocks the propagation of lightning surges to communication equipment by electrically separating (isolating) the surge’s entry path. Used for such a purpose, isolation transformers allow only the necessary power or communication signals to pass through while electrically isolating lightning surges in a manner that prevents such surges from entering the communication equipment.


Fig. 6. Conceptual diagram of lightning protection via isolation.

An example of isolation in a telecommunication building is shown in Fig. 7. When wiring (such as that for clock signals) must span multiple floors, a potential difference between the telecommunication devices connected by the clock lines might occur. Therefore, an isolation transformer (Interface C in the figure) is installed to prevent the occurrence of a potential difference between telecommunication devices located on different floors.


Fig. 7. Example of an isolation measure in a telecommunication building.

3. Case study of communication equipment failure

A case of lightning-induced failure in a telecommunication building for which we proposed potential-equalization measures is presented as follows.

3.1 Details of failure

During a thunderstorm, there was a failure involving communication equipment and a rectifier unit installed in a telecommunication building, and the failure resulted in the unavailability of certain services (e.g., Internet connectivity and fiber-optic telephony). Although the services were restored after on-site maintenance personnel carried out troubleshooting steps (such as removing and reinstalling circuit boards in communication equipment), Technical Assistance and Support Center, NTT EAST (TASC) was asked to investigate the cause of the failure and propose countermeasures to prevent a recurrence.

3.2 Investigation

The configuration of the equipment installed in the telecommunication building, as confirmed by on-site survey, is shown in Fig. 8. The equipment-related characteristics identified as potential causes of the failure are as follows.


Fig. 8. Configuration of equipment in the telecommunication building.

1) Surge arresters with different operating voltages (500 V and 82 V) are installed in the low-voltage distribution board and the optical-line testing equipment, respectively (Fig. 8, configuration (1)).

2) The grounding lines of equipment racks (1) and (2) are interconnected (Fig. 8, configuration (2)) and connected to the integrated grounding.

3) Optical-line testing equipment is mounted on equipment rack (1) (Fig. 8, configuration (3)).

Lightning-strike data recorded at the time of the failure indicated that a lightning strike was detected at a location approximately 100 meters from the telecommunication building.

3.3 Estimation of the cause of failure

In consideration of the characteristics of the equipment and the fact that a lightning strike occurred approximately 100 meters from the telecommunication building at the time of the failure, we concluded that the failure was caused by a lightning surge. The estimated propagation path of the lightning surge is shown in Fig. 9.


Fig. 9. Estimation of lightning-surge paths.

This lightning surge entered the building via the alternating current (AC) power line and propagated through the low-voltage distribution board, rectifier unit, DC distribution unit, equipment racks (1) and (2), and eventually reached the integrated grounding and the tension members of the optical cable. The estimated mechanism of the equipment failure is described in the following steps.

1) The lightning surge causes a potential difference between the power lines of the low-voltage distribution board and the frame ground of equipment rack (1), which houses the optical-line testing equipment (Fig. 9 (1)).

2) The surge arrester built into the optical-line testing equipment is activated first because its operating voltage is lower (Fig. 9 (2)).

3) Activation of the surge arrester of the optical-line testing equipment allows the lightning-surge current to flow along the previously estimated route, and that surge current causes the rectifier unit to fail (Fig. 9 (3)).

4) The lightning-surge current causes potential fluctuations on the ground line of the communication equipment, and those fluctuations cause an overvoltage between the ground line and −48 V line, which in turn causes the communication equipment to fail (Fig. 9 (4)).

3.4 Proposed countermeasures

To prevent the propagation of lightning surges even if the surge arresters in the optical-line testing equipment activate, we implemented countermeasures to equalize the potential between the DC distribution unit and equipment rack (1), as shown in Fig. 10. Specifically, a new grounding line to connect equipment rack (1) and the DC distribution unit was installed (Fig. 10, countermeasure 1), and the grounding line between equipment racks (1) and (2) was removed (Fig. 10, countermeasure 2).


Fig. 10. Configuration of equipment with implemented countermeasures.

4. Concluding remarks

The fundamental principles for protecting power equipment and communication equipment installed in telecommunication buildings from lightning surges were outlined and a case of equipment failure caused by lightning, along with the corresponding countermeasures, was presented. Such efforts are essential for the continuous provision of stable telecommunication services. TASC will continue contributing to solving on-site problems through technical support for those involved in the maintenance and operation of telecommunication facilities.